Ray Angelini, Inc. was hired as the Electrical Installation Contractor and as such our responsibilities included providing
all of the manpower necessary to facilitate this project. We mobilized the entire 16 acre site within 24 hours from notice
to proceed and have installed Qty. 15,700 of the 17,160 total modules in less than one and a half month’s time.
Additionally our scope included the installation of all Combiner Boxes, Disconnects, Galvanized Wire tray, Junction boxes,
Wire, Grounding, A/C and D/C Conduit/ Wire and trenching, Inverter Pad Layout, Setting Inverters/ Transformers/ Switchgear,
Including Primary PECO Interconnection and Service, All High Voltage Cabling and Terminations, Start-up, Testing, and Warranty.