Springhouse Middle School

LOCATION:
Allentown, Pennsylvania
DESIGN / BUILD / COMPLETION DATE:
September 2007
SYSTEM:
Complete Network, Audio/Video, Clock and Speaker System

RAI provided a complete network infrastructure and clock/speaker infrastructure located in the Springhouse Middle School.
The system consisted of over 1200 CAT 6 cables, over 160 RG-6 cables, 250 Clocks, 350 Speakers, 95 A/V locations and 4 sound systems. We installed a master clock and speaker system with headend equipment in the main office, also JBL and a Soundsphere for audio in the gym and cafeteria.

RAI scope included, but was not limited to:

  • Terminations, x-connects and patch
  • Testing and warranty of cables
  • Firestopping
  • Installation of pathways, faceplates, audio/video/vga connectors, 110 blocks, and connections of clocks and speakers in the school.
  • Balancing catv, A/V and 4 sub sound systems (2 main gym, 1 auxiliary gym, 1 cafeteria)
  • System training